257 results:
4. Röhre Elbtunnel   4. Röhre Elbtunnel The existing Elbe Tunnel opened in 1975 with 3 tubes and 6 lanes, was designed for some 70,000 vehicles/d. With up to 140,000 vehicles/d at peak periods, the tunnel's capacity was...  
: Freudensteintunnel-Investigation   Freudensteintunnel-Investigation The construction of the pilot tunnel with enlargement and test sections was carried out to more closely investigate the rock conditions and in order to prepare for...  
Alter Loreley and Rossstein Tunnels   Refurbishment of old Loreley and Rossstein Tunnels These 2 railway tunnels were originally built between 1860 and 61 and had to be refurbished for safety reasons. The Alte Loreley and the Alte...  
Antwerp North-South Link (ASDAM)   Antwerp North-South Link (ASDAM) The section included the driving of two single-track tunnel tubes between the Astridplatz in front of the Central Station and the Damplatz in the north of Antwerp....  
Arnsberg Altstadt Tunnel   Arnsberg Altstadt Tunnel The surrounding ground comprises alternating beds of solid to hard limestones and chalky clay shales and marl shales. The ground only permits little water to pass through it,...  