Skip navigation

Project listing

265 results:
Main Line Tunnel Berlin, Lot 3, Ramp Structure using the Caisson Method   Main Line Tunnel Berlin, Lot 3, Ramp Structure using the Caisson Method Crossing the city in a north-south direction in Berlin's central area is an important task in developing its rail links. A 3.5...  
Main Line Tunnel Berlin, Lot 3, Shield Heading   Main Line Tunnel Berlin, Lot 3, Shield Heading Crossing the city in a north-south direction in Berlin's central area is an important task in developing its rail links. A 3.5 km long tunnel is being...  
Mangfall, Mühlthal, Hachingen galleries   Mangfall, Mühlthal, Hachingen galleries The Water Supply Department ot the "Stadtwerke München", in a long term project, is replacing its over 100 year old free-flow water pipes from the...  
Markstein/Nebenwegtunnel   Markstein/Nebenwegtunnel Within the framework of the roughly 100 km long new line between Mannheim and Stuttgart, the topographical conditions east of the town of Vaihingen/Enz called for the...  
Mehrum Power Station   Mehrum Power Station For the 700 MW coal power station Mehrum on the Mittellandkanal a far-reaching redevelopment of the sewer and shaft system as well as the construction of a total of 2 measuring...  
###SPINNER###
Search results 121 until 125 of 265