Skip navigation

Project listing

271 results:
Goldisthal Pump Storage Power Station   Goldisthal Pump Storage Power Station The VEAG Vereinigte Energiewerke AG is setting up its new Goldisthal pump storage power station in the west of the Thuringian Schiefergebirge on the course of...  
Gotthard Base Tunnel, Bodio Bypass   Gotthard Base Tunnel, Bodio Bypass The Gotthard Base Tunnel, a project of the century, consists of two parallel single-track tubes, each 57 km long and represents the core of the Alp Transit route of...  
Gotthard Base Tunnel, Contract 360, Section Sedrun   Gotthard Base Tunnel, Contract 360, Section Sedrun The Sedrun contract section represents the core of the 57 km long Gotthard Base Tunnel, which will enable high-speed trains to cross the Alps on a...  
Grimstad-Kristiansand Tunnel, E 18   Grimstad-Kristiansand Tunnel, E 18 The E 18 Grimstad-Kristiansand is the third pilot project to be based on a PPP model in the Norwegian transport system. The section between Grimstad and...  
Grötzingen Tunnel   Grötzingen Tunnel Apart from the BAB A 8 motorway, the federal highway B 10 is the most important east-west link between Karlsruhe and Pforzheim Following a traffic survey in 1990, an analysis of the...  
###SPINNER###
Search results 71 until 75 of 271