Skip navigation

Project listing

274 results:
Klein-Winternheimer Tunnel   Klein-Winternheimer Tunnel The Klein-Winternheim Tunnel was built during 1868 to 70 for two-track railway traffic. However, it has only been used for single-track operation over the years. The tunnel...  
Klingenberg Dam Renovation Auxiliary Water/Flood Relief Tunnel   Klingenberg Dam Renovation Auxiliary Water/Flood Relief Tunnel After practically 100 years of service the Klingenberg Dam structures and facilities in the eastern Ore Mountains are desperately in...  
Köhlbrandtunnel   Köhlbrandtunnel The construction of a new incineration plant in Hamburg-Waltershof at the same time required a new remote-steam connection line below the Köhlbrandt, a side arm of the Elbe. In the...  
Kops II Pump Storage Power Station   Kops II Pump Storage Power Station The growing significance of renewable energies and the increasing demand for peak and operating electricity supplies on a liberalised energy market represent the...  
Krefeld water supply   Krefeld water supply So far, the trenchless laying method has largely been used in conjunction with pipelines made of plastic. At the same time, it is also technically feasible to lay ductile cast...  
###SPINNER###
Search results 91 until 95 of 274