Main Collector Düsseldorf Centre, Lot 1
Main Collector Düsseldorf Centre, Lot 1
The Main Collector centre reorganises the wastewater currents by directing them to the expanded wastewater Treatment Plant South. The section of construction...
Main collector Leipziger Straße- Am Ringelberg
Main collector Leipziger Straße- Am Ringelberg
The City of Erfurt was required to lengthen a main collector for sewage by a total of 900 m within the framework of the development of a new estate,...
Main Line Tunnel Berlin, Lot 3, Ramp Structure using the Caisson Method
Main Line Tunnel Berlin, Lot 3, Ramp Structure using the Caisson Method
Crossing the city in a north-south direction in Berlin's central area is an important task in developing its rail links. A 3.5...
Main Line Tunnel Berlin, Lot 3, Shield Heading
Main Line Tunnel Berlin, Lot 3, Shield Heading
Crossing the city in a north-south direction in Berlin's central area is an important task in developing its rail links. A 3.5 km long tunnel is being...
Mangfall, Mühlthal, Hachingen galleries
Mangfall, Mühlthal, Hachingen galleries
The Water Supply Department ot the "Stadtwerke München", in a long term project, is replacing its over 100 year old free-flow water pipes from the...