Project listing
276 results:
Nollinger Berg Tunnel (2nd tube)
Nollinger Berg Tunnel (2nd tube)
The Nollinger Berg Tunnel had to be built in conjunction with the High Rhine motorway A 98 Weil am Rhein-Waldshut, contract section Waidhof-Rheinfelden/Karsau and the...
Norra Länken, Contract Sections NL 35 and NL 51
Norra Länken, Contract Sections NL 35 and NL 51
Norra Länken (North Link) forms the northern part of a planned motorway ring around the centre of Stockholm. The scheme is altogether 5 km lang....
Nuremberg Underground Railway, Line 3 North, Contract Section 1.2, Maxfeld Station and Tunnel Sections
Nuremberg Underground Railway, Line 3 North, Contract Section 1.2, Maxfeld Station and Tunnel Sections
Contract section 1.2 of Underground railway line 3 increased the 27 km long Nuremberg metro...
Offenbau Tunnel
Offenbau Tunnel
A 1,331 m long two-track tunnel was produced close to the village of Offenbau between km 40.536 and 41 .867 as part of the contract section North on the new route between Nuremberg...
Offenburg Combined Water Sewer
Offenburg Combined Water Sewer
In order to relieve the existing, historic combined water system in the east part of Offenburg, a new combined water collector was driven underground as a feeder for...
###SPINNER###