Project listing
276 results:
Old Busch Tunnel
Old Busch Tunnel
The Busch Tunnel was driven in Hauset Sand from 1841 to 1843. The tunnel was originally 741 m but it was shortened by 50 m in 1884. The maximum overburden amounts to roughly 51 m....
Parking cavern "Hinterer Zwinger", Leonberg
Parking cavern "Hinterer Zwinger", Leonberg
The up to 10 m thick covering layers largely comprise artificial fill (mostly cohesive soil) and to a lesser extent detritus (clay silt soils, in some...
Peißenberg South-B 472
Peißenberg South B472
As part of the B472, Peißenberg Bypass, the low-lying section with the Peißenberg Tunnel, represents the biggest single scheme. The conception and production of this low-lying...
Pörzberg Tunnel - L1048
Pörzberg Tunnel - L1048
The current regional highway L 1048 and Future B 90 as a motorway feed for the urban conurbation involving the three towns of Saalfeld, Rudolfstadt and Bad Blankenburg to the...
Pragsattel/Löwentor Tunnel
Pragsattel/Löwentor Tunnel
The Pragsattel serves as an important traffic hub in the Stuttgart road network from the north towards the downtown area and into the Neckartal valley. The tunnelling...
###SPINNER###