Skip navigation

Project listing

276 results:
Redevelopment of Alter Mainzer Tunnel   Redevelopment of Alter Mainzer Tunnel The route between Mainz Central Station and the Mainz South Station was built between 1881 and 84 as a twin-track tunnel. On account of pronounced damage, during...  
Refurbishing the Tunnel near Niederschlema   Refurbishing the Tunnel near Niederschlema The Schlema railway tunnel that was built from 1898 to 1900 had to be redeveloped as part of the upgrading of the line between Schwarzenberg and Zwickau....  
Refurbishment of old Loreley and Rossstein Tunnels   Refurbishment of old Loreley and Rossstein Tunnels These 2 railway tunnels were originally built between 1860 and 61 and had to be refurbished for safety reasons. The Alte Loreley and the Alte...  
Reitersberg Tunnel   Tunnel Reitersberg The Reitersberg Tunnel is part of the new line Ebensfeld - Erfurt (Transport Project German Unity Rail No. 8.1). The 2,975 m long tunnel is located within the approx. 5.6 km long...  
Rennsteig Tunnel   Rennsteig Tunnel The Rennsteig Tunnel with a length of 7,900 m is Germany's longest motorway tunnel. It forms the core of the "German Unity" transport projects in the Thuringian Forest. It...  
###SPINNER###
Search results 171 until 175 of 276